However, in the last couple of weeks we finally got the bathroom fitted out. In the last two days the kitchen has also been fitted. Yet in true Bulgarian style, the oven and cooker are still waiting for power and we still have no plug for the fridge. In fact, we don't actually have any electrics at all, but are hoping it will be resolved very soon.
We are adamant that we are moving in this weekend so are pushing Daniel the electrician (who disappears for days on end) to get us connected.
This is only a quick post as we have been really up against it this week trying to wood stain and paint the ceiling before the kitchen went in and Chris has been busy making doors for the kitchen. Its been our most tiring and traumatic week yet trying to get everything ready and battling with the builders willing them to come and finish the job before the kitchen fitters arrive. Of course there were problems but we are learning to accept that things are not always going to be how you planned or envisaged them and getting things 95% how you want them it pretty good going.
Anyway, here are a few pictures to show how progress is going.
The kitchen ceiling being painted
The kitchen door to the utility room made by Chris
The kitchen window going in and the floor tiled
All ready for the cupboards to arrive
After day one of kichen cupboard assembly
After day two
Fridge and dining room table now in
Bath installed
Shower installed
View from the bath
Wall surrounding patio being built
View from kitchen doors
Kitchen doors installed and new wall built
Patio area outside lounge and downstairs bedroom
View from downstairs bedroom
Waiting for the stone plodgers to be put on top
We have now lost our stone masons for a few weeks as they have gone to work on another house. Hopefully they will be back soon to work on our summer kitchen.